The
following are general instructions for concrete waterproofing,
repair and protection using SUPERSHIELD DPC (Deep Penetrating
Capillary) WATERPROOFING products. For detailed information
concerning the products and their application please refer
to the specific Technical Data Sheet and Application Guidelines
under www.supershieldindia.com. For details concerning specific
problem solutions please contact your local SUPERSHIELD
distributor or SUPERSHIELD. |
Preparation
of Substrate
Concrete
to receive SUPERSHIELD treatment must have a clean surface
and open capillary system to ensure maximum bonding. Surfaces
to be waterproofed should be examined for structural defects,
and unacceptable conditions reported and Remedied.
Remove
all cement laitance, shutter release agent, curing compound,
loose particles, etc. by means of light, wet or dry sandblasting,
high pressure water jetting or wire brushing. Water leaks
must be stopped in accordance with the SUPERSHIELD PLUG
Application Guidelines.
Remove
all protrusions and cut back to sound concrete, chasing
out any honeycombed or damaged areas where appropriate.
Construction joints and shrinkage cracks exceeding 0.3 mm
should be routed out to a minimum depth of 20 mm. Shutter
tie holes should be roughened.
Clean
all chased out areas, shutter-tie holes, etc. and pre-water
until the concrete is saturated.
Following
this, fill the areas with appropriate SUPERSHIELD CRYSTALPATCH
in layers, the number depending on the total layer thickness. |
| Pre-Watering
Prior
to applying SUPERSHIELD, carefully rinse all the surfaces
to be waterproofed and pre-water with clean water. Pre-water
several times so that the concrete is thoroughly saturated.
When SUPERSHIELD products are applied, the surface should
be damp but not wet. Any surface water on horizontal surfaces
must be removed. |
Mixing
Place
SUPERSHIELD powder in a clean container, add the indicated
amount of clean water or polymer dispersion for two component
products and stir for at least 3 minutes with a mechanical
mixer until the mixture is completely free from lumps.
To maintain workability do not add water, simply re-stir
the mixture.
Once
mixed, SUPERSHIELD materials have a limited pot life. Refer
to Technical Data Sheet for details. Do not mix more material
than can be used within pot life. |
Climatic
Conditions
Do
not apply SUPERSHIELD at temperatures below +5 °C (40
°F) or to a frozen substrate unless otherwise indicated
for specific products. |
Application
Brush
Application
Specific SUPERSHIELD products (refer to product's Application
Guidelines) can be applied using a suitable brush (mason's
brush). Ensure that all cavities in the substrate are filled
in order to exclude any trapped air.
If
several layers are applied it is recommended that the following
layer is applied whilst the previous layer is still damp.
The waiting time before applying the following layer depends
on the specific product and on local climatic conditions
such as humidity, temperature, etc. The previous layer must
not be damaged during application of the following layer.
Spray
Application
SUPERSHIELD
may be applied using appropriate fine mortar spraying device.
The air pressure, air volume and nozzle size required will
depend on the type of SUPERSHIELD material to be sprayed.
The
compressor performance must be at least 5 bar pressure,
delivering 500 l/min.
The
first layer of SUPERSHIELD is applied in circular motion
with the spray nozzle held at a 90° angle to the substrate.
The distance between the spray nozzle and the surface will
depend on the spray gun/compressed air used. The material
is then flattened with a suitable trowel. This operation
levels the surface and increases adhesion to the substrate.
If
several layers are applied it is recommended that the following
layer is applied whilst the previous layer is still damp.
The waiting time before applying the following layer depends
on the specific product and local climatic conditions such
as humidity, temperature, etc. The previous layer must not
be damaged during application of the following layer.
SUPERSHIELD
Dry sprinkle and power trowel application
When
the concrete to be treated starts to reach initial set,
the specified amount of SUPERSHIELD is dry-distributed by
hand using a sieve or garden type fertilizer spreader on
to the concrete surface.
It
is then trowelled in until coverage is uniform and the specific
finish is achieved. Where specified SUPERSHIELD is dry distributed
to blinding concrete or construction joints immediately
prior to casting the structural slab or wall. |
| Additive.
Additives are formulated
differently to meet the requirement of the plastering and
concrete mix .SUPERSHIELD CRYSTAL PLAST for plastering and
SUPERSHIELD ADMIX for concrete.
Plastering Additive
Mix SUPERSHIELD CRYSTAL
PLAST with water to form a very thin slurry (e.g. 1 part.
of powder mixed with 2 parts of water) and add to the cement,
sand mix.
The sand, cement and water
should be added and mixed in accordance with standard practices
(taking into account the quantity of water that has already
used to form the thin slurry).
Concrete Additive.
SUPERSHIELD ADMIX is added
to the concrete at the time of batching. The sequence of
procedures for addition will vary according to the type
of batch plant operation and equipment.
1. READY MIX PLANT
- DRY BATCH OPERATION
Add SUPERSHIELD ADMIX
in powder form to the drum of the ready-mix truck. Drive
the truck under the batch plant and add 60% - 70% of the
required water along with 300 lb. - 500 lb. (136 kg - 227
kg) of aggregate. Mix the materials for 2 - 3 minutes to
ensure the ADMIX is distributed evenly throughout the mix
water. Add the balance of materials to the ready-mix truck
in accordance with standard batch practices.
2. READY MIX PLANT
- CENTRAL MIX OPERATION
Mix SUPERSHIELD ADMIX
with water to form a very thin slurry (e.g. 1 part. of powder
mixed with 2 parts of water). Pour the required amount of
material into the drum of the ready-mix truck. The aggregate,
cement and water should be batched and mixed in the plant
in accordance with standard practices (taking into account
the quantity of water that has already been placed in the
ready-mix truck). Pour the concrete into the truck and mix
for at least 5 minutes to ensure even distribution of the
SUPERSHIELD ADMIX throughout the concrete.
|
Curing
and Protection
SUPERSHIELD
products are cement-based and will cure and harden in the
same way as ordinary concrete. Setting and hardening will
depend on the surrounding temperature and humidity.
For
maximum effectiveness from your SUPERSHIELD treatment, it
is essential that the layers are kept damp for at least
3 days and protected against evaporation by sun and wind.
Careful
post-watering should be carried out at intervals, starting
the day following the application. Alternatively, the surfaces
can be covered with plastic sheeting, wet mats or moist
sand. The use of curing compounds is not recommended. In
closed spaces and deep pits, air circulation should be provided
for 24 hours following the SUPERSHIELD application.
For
polymer-modified two component products observe product
specific information on Technical Data Sheet and Application
Guidelines.
The
freshly treated surfaces should be protected from rain for
a minimum period of 24 h. Surfaces treated with SUPERSHIELD
should be protected from frost for at least 5 days. If necessary,
cover with insulation mats. |
Backfilling
Backfilling
can be carried out 3 days after completion of the SUPERSHIELD
treatment. |
Decoration,
Coating, Tiling
All
surfaces treated with SUPERSHIELD products, which are to
be coated or painted, must be left to cure for at least
2 weeks.
DPC waterproofing products At the end of the curing period,
prior to the application of coatings or paints, the surfaces
should be saturated with water and neutralised with 1:8
solution of hydrochloric (muriatic) acid. Following this,
the area must be thoroughly rinsed with water.
Precautions:
When spraying with hydrochloric (muriatic) acid solution,
use protective rubber clothing and goggles. |
Filling
of Water Retaining Structures
In
accordance with standard water industry practice, particular
note needs to be taken of the following points:
Clean
all surfaces (ceiling, walls, slab, columns, stairs, etc.)
with drinking water (do not use high pressure) Remove all
cleaning water Disinfect all internal surfaces with approved
disinfectants Remove all disinfectant.
Filling
can take place when the surface treatment has hardened sufficiently,
usually not less than 14 days after application.
However,
if earlier filling is specifically required, filling may
be considered after not less than 7 days, provided the surface
is thoroughly checked for hardness. |
Additional
Information
SUPERSHIELD
treatments are waterpoofing and protective, not decorative
finishes.
Discolouration of the treated surface may occur. Such discolouration
in no way detracts from the waterproofing effect. |
Health
and Safety
Cementitious
SUPERSHIELD products are irritating to skin. Risk of serious
damage to eyes. Keep out of reach of children. Do not breathe
dust. Avoid contact with skin and eyes. In case of contact
with eyes, rinse immediately with plenty of water and seek
medical advice. Wear suitable gloves.
For
further information please refer to Material Safety Data
Sheet. |
The
information contained herein is based on our long term experience
and the best of our knowledge. We can, however, make no
guarantee since for a successful outcome, all circumstances
in an individual case must be taken into consideration. |
|
| |
|
|
|
|